Context
-
The 117th Meeting of Permanent Indus Commission (PIC) between India and Pakistan was held.
-
Earlier, the Central government has decided to adopt a new criterion for selecting members of the Bhakra Beas Management Board (BBMB).
Key Details of the Permanent Indus Commission Meeting
- Both sides discussed the exchange of hydrological and flood data during which the Indian side underscored that all its projects are fully compliant with the provisions of the Indus Waters Treaty.
- The issue of the Fazilka drain was also discussed and Pakistan assured that all necessary action will continue to be taken to ensure the free flow of Fazilka drain into the river Sutlej.
- Fazilka drain is one of 22 drains and water bodies, where untreated water of Malwa district (Punjab, India) is discharged.
- The drain is closed at the borderline of countries, leading to stagnation in the shape of ponds and deterioration of quality of groundwater in the border area.
- Technical discussions were held regarding ongoing projects including Pakal Dul, Kiru and Lower Kalnai.
- The Pakal Dul Hydro Electric Project (1000 MW) is proposed on river Marusudar, a tributary of Chenab river in the Union Territory of Jammu & Kashmir.
- Kiru Hydro Electric Project (624 MW) is proposed on River Chenab, located in Kishtwar district of Jammu & Kashmir.
- Lower Kalnai project is a hydroelectric power project in the Doda and Kishtwar districts of Jammu and Kashmir.
- The Indian side explicitly conveyed that as an upper riparian State, India has been providing information on extraordinary discharges of water from reservoirs and flood flows every year, as mandated under the treaty.
Source: TH
Visit Abhiyan PEDIA (One of the Most Followed / Recommended) for UPSC Revisions: Click Here
IAS Abhiyan is now on Telegram: Click on the Below link to Join our Channels to stay Updated
IAS Abhiyan Official: Click Here to Join
For UPSC Mains Value Edition (Facts, Quotes, Best Practices, Case Studies): Click Here to Join